about us

PORT BALCHIK

Port terminal Balchik is situated in the region of the northern coast in the central part of the town of Balchik within regulation. Balchik port terminal is part of a public transport port of national importance Varna. The port terminal is built and operated since 1969 ranks as the third place among the largest ports on the Black Sea coast. 

 

Implemented under the scheme is single walled mall (so Balchik breakwater).The total area is 11,338 km. It has has two berths with a total length of quay wall 164 meters. It is equipped with two 10-ton overhead cranes and all necessary mechanization quay for handling general, bulk and liquid cargo plant. In the port terminal can be processed simultaneously by two small vessels (ie 3000-4000) in permissible draft 8 m.

The port terminal has a 4,000 sq.m outdoor storage areas. The territory has established a border checkpoint, customs office, post phytosanitary control and others. Cargoes to and from the port terminal is transported by road. The port terminal is designed for handling import and export of general, bulk, liquid vegetable cargo and mail.

In execution of the concession contract Port Balchik build in Balchik port terminal "Complex for storage, transportation and loading of bulk / grain /" with loading capacity of 2000 tons. Silo complex consists of two silos with a loading capacity of 1,000 tons each, made of rings made of galvanized steel sheet, the size of the silos: diameter - 11.45 m; height of the cylinder with the roof - 15.84 m and single volume - 1385 cubic meters / total volume of 2770 cubic meters/. Producer of the grain complex is a world leader in this type of equipment "Cimbria Unigrain" A/S – Denmark and the contractor of the works is "Stimex".

Port Balchik Plc is a business of port services of loading, unloading, stacking, storage, repackaging of different types of loads, intra / terminal / cargo and mail in public ports, sea-technical services to which requires the use of port territory and / or port facilities - supplying ships with water, telephone and electricity mooring.

During the period of concession Port Balchik strives to bring the port terminal in accordance with the highest standards at European ports and in accordance with best international practice by reconstruction, modernization and construction of new infrastructure on the territory of the port terminal. With the signing of the concession contract is accepted and investment program for the implementation of Port Balchik. The total investment for the entire duration of the concession amounted to 3,474,800 leva, for the first ten years implementation must amounted to 2,851,700 leva. The total amount of investments made by recognized investment programs from the beginning of the concession period to 31 December 2016 amounted to 4 531 531 leva.

VISIT OUR WEBSITE PORT BALCHIK